Yearly Archive: 2013

Stop the Keystone XL South Before It Spills!

Please sign our petition on CREDO Mobilize HERE. We urge PHMSA to issue TransCanada a Corrective Action Order to require that the Keystone XL Gulf Coast Project (KXL South) be dug up and rebuilt according to code, or not at all. The Keystone XL Gulf Coast Project (KXL South) was installed in Texas and Oklahoma …

Continue reading »

Permanent link to this article: http://www.tarsandsblockade.org/petitionphmsa/

TSB Engages PHMSA at Pipeline Safety Conference

Why PHMSA Must Proactively Issue A Corrective Action Order For Keystone XL Gulf Coast Project (do not print this, it won't make sense when folded)

TSB recently traveled to NOLA to attend the annual Pipeline Safety Trust (PST) conference held on Nov. 21-22 at the fancy Hotel Monteleone, in the heart of New Orleans’ French Quarter. The PST website says the conference intended to “bring together a unique mix of experience from the affected public, local government, the pipeline industry, …

Continue reading »

Permanent link to this article: http://www.tarsandsblockade.org/tsb-phmsa-nola/

Exposed: University President Lied to Students About Fracking On School Property

gallery_1_132_548669

Reposted from Occupy.com Exposed: University President Lied to Students About Fracking On School Property At a Q&A session with students in October of 2012, University of North Texas President Veldon Rawlins told students that there was no fracking on University property. The following summer, two Eagleridge Inc. frack wells were installed next to Apogee stadium …

Continue reading »

Permanent link to this article: http://www.tarsandsblockade.org/frackin-unt/

Older posts «